The Community Council of Agios Epifanios has executed and planned several infrastructure and beautification projects which aim at developing the community and improving the quality of the residents’ life.

Completed:
The following development projects, which had been included in the budget, were completed by the Community Council during 2007. 

Flood-protection £  5 000
Community Buildings £  2 000
Inside Roads £10 000
Beautifying projects £  5 000
Roads Passing through vineyards   £  3 000
Agricultural Roads £  8 000

The following projects, which had not been included in the budget, were completed with funds provided by the District Administration or other Ministries.

The following development projects, which had not been included in the budget, were completed during 2008 by the Community Council.

Flood-protection €10,252
Community Buildings €  5,126
Inside roads €29,046
Beautifying projects €10,252
Roads passing through vineyards €  5,126

Also out of budget for the year 2008 were the following projects, which were completed using funds provided by several Ministries and by the Eparch of Lefkosia.

In particular:
Roads: We have given great emphasis to the community’s road network, both within the community as well as to the agricultural roads.

Street Lighting: In the past two years, street lighting has been installed in Agios Georgios Street and in the road of the new church, up to the Cooperative Bank. The total expenditure reached the amount of €12,000.
This year, there are plans for the installation of street lighting along 1st of May Street, Nicolas Kostis Street, along the road passing from the Cooperative Bank up to the central reserve of Arch. Makarios Street and along the entire road starting from the parting of ways towards the community. The budget will exceed the amount of €40,000.

Fires: Seeing the need to be prepared in case of fires, the Community Council has bought a fire truck after receiving 50% funding by the Ministry of Interior. The vehicle is used for other needs of the community such as cleaning campaigns, decorations etc.  

Primary School and Community Nursery School
The Community Council assumed the management and problems of the community’s School Inspectorate on the 31st of December 2006.

The pressure put on the School Inspectorate in order to merge, close down the school and transfer our students to a regional School with other communities is well known. 

However, we have succeeded in upgrading our school and started working on anti-seismic upgrading and restoration.

The new Futsal pitch which was constructed in 2007 cost €25,000 and the expenditure was covered entirely by the Ministry of Education and Culture.

Additionally, a new Nursery School classroom, new lavatories and a laboratory have been planned and are going to be constructed.

The intentions of the Ministry of Education regarding the creation of regional schools remain unknown. Therefore, we will always be on alert so that our school is not closed down. This of course will always depend on the number of new students.